Feasibility Study and Master Plan for the development of Kaboja Industrial City “KIC”, Msata Township, Bagamoyo District, Tanzania.
Client: Hon Mi Ting Co.
July 21, 2015
Project Name:-
Feasibility Study and Master Plan for the development of Kaboja Industrial City “KIC”, Msata Township, Bagamoyo District, Tanzania.
Country:- Tanzania
Location within Country:- Bagamoyo District, Tanzania Professional Staff Provided by your Firm:- Project Manager, Town Planner, Infrastructure Planner, Architect, Civil Engineer, Electrical Engineer, Structural Engineer, Hydrologist, Geotechnical Engineer, Environmentalist, Economist, Financial/ Investment Analyst, Market Researcher, and GIS/CAD Expert.
Name of Client:
Heritage Empire Ltd. / Tanzania Development Bank No of Staff Months:
58
Address
Plot 199, Lukuledi St Regent Estate
Dar-es-Salaam, Tanzania Client’s Contact Person for the Assignment:
Mr. Beatus Kaboja (Heritage Empire Ltd)
Mr. K. Boni (Tanzania Development Bank)
Start Date:-(Month/Year)
August 2014 Completion Date:-
(Month/Year)
June 2015 Approx. Value of Services (in US$): $595,480
Name of Associated Consultants. If any:
Bedrock Capital (Pty) No. of Months of Professional Staff Provided by Associated Firm(s):- 11
Name of Senior Staff (Project Director/Manager, Team Leader) involved and functions performed:-
Eng. K.B. Mwaniki, Project Manager/Infrastructure Planner. Overall responsibility of project services delivery, co-ordination of other service providers and principle contact person between the consultant team and the Client.
Had further responsibility of all infrastructure planning aspects.
Narrative Description of Project: – The project involved Feasibility study and Master Plan for a 4,219 acres Industrial and Commercial Park development, to be designated as an EPZ (export processing zone) and Free Trade zone, respectively with specific national investment incentives and development guidelines. A 10yr three (3) phased development of a mixed end-use industrial park (metal fabrication, cylinders and pipes fabrication, agro-processing, tannery, textiles and apparels, light assembly, packaging and warehouses) and a commercial complex with showrooms (finished products); small business incubator; ITC, vocational training school, offices, and administrative centre housing the Tanzania Revenue Authority, Customs and Tanzania Investment Centre and Park Administration. The integrated development includes single and multi-family staff housing estates, schools, district hospital, two (2) nos. retail centers, religious areas, recreational parks, a railway spur/link and an aerodrome. KIC master plan structured as in part aspects of an Eco-Industrial Park, with SEZ/EPZ oriented planning and development, at an estimate US$ 215Million construction cost for the first phase development of 1,150 acres, including offsite capital infrastructure.
Description of Services/Tasks Performed: Master Plan and Feasibility Study Tasks:
• Strategic Planning (vision, objectives, framework, structure, phase approach, ECO park etc.)
• Needs Assessment (community and institutional stakeholder’s consultations)
• Demand Forecast Study & Analysis (land, labour, industrial trends, supply chain, housing, demographics etc. as required)
• SWOT Analysis (strengths, weaknesses, opportunities & threats) & Comparative Market Survey Study.
• Statutory Requirements Compliance (zoning, ordinances, land tenure, etc.)
• Spatial Planning
• Infrastructure Planning (all roads, accessibility, water mains, wastewater mains, drainage, power plant facilities, sewerage plant and facilities, water reservoirs, gas utility lines, electrical utility lines-Preliminary Design Level)
• Transportation and Transit Corridor Assessment.
• Water Utility Demand, and Power Utility Demand Studies and Prescribed System/Facilities/Infrastructure
• Wastewater and Solid Waste Generation Study and Prescribed System/Facilities/ Infrastructure
• Programming and Program of Development
• Construction Cost and Implementation Cost Estimate
• Financial Analysis and Model (sensitivity analysis with varying funding contribution public versus private, varying sales projections and other variables as required)
• Investment and Public Private Partnership (PPP) Opportunities Articulation and Structure
• Implementation Plan (phased approach, phase description, schedules and cost allocations)
• Organizational Structure of Administrative and Operational Authority of Proposed Site Development Facilities/Complex.
• Conceptual and Preliminary Drawings: (layouts, site plan, land-use plan, infrastructure plans etc.)
• Illustrative Architectural Layouts and 3Ddrawings and Model.
• Detailed Site Condition Assessment Survey.
• Geotechnical Investigations and Materials Surveys
• Environmental Impact Assessment Strategic Study.
Coda And Partners is the specialized Consulting Engineering member firm of Coda
Consulting Group worldwide. The firm provides specialized engineering consulting services
in civil and structural engineering, agricultural engineering, infrastructure planning, project
management and other related areas. Coda And Partners has been successfully providing
professional consulting services for over 35 years.